Section 12.12.238 Capital Facilities Charge.

No water meter measuring city water usage shall be installed in a facility constructed after the effective date of this ordinance until the applicant has paid a capital facilities charge based upon the size of the water meter determined from the following table.  A larger water meter shall not be installed in an existing facility until the applicant has paid a capital facilities charge based upon the size of the water meter installed minus the capital facilities charge assigned to the water meter removed with the charges determined by the following table:  (Ord. 94/U-1928)

            CAPITAL FACILITY CHARGES

        Meter Size            CFC Per Meter

        5/8"                $    109
        3/4"                $    164
        1"                $    272
        1 1/2"                $    545
        2"                $  1,744
        3"                $  3,815
        4"                $ 10,900
        6"                $ 21,800