Section 12.16.400 Inspection of pipe.

  A permit shall be obtained from the public works department prior to commencing construction of the storm sewer pipe.  No storm sewer pipes laid underground shall be covered and the trenches filled up by any plumber or utility contractor until the storm sewer pipes and all connections have been inspected by the city’ s utility inspector and found to be water tight. (Ord. 2006-0834)