Chapter 12.03 ELECTRICITY FRANCHISE TO RURAL ELECTRIC COOPERATIVE
Chapter 12.05 PUBLIC UTILITY DISTRIBUTION REGULATIONS
Chapter 12.06 HIGH-VOLTAGE ELECTRIC LINES
Chapter 12.10 UTILITY SERVICE BILLING REGULATIONS
Chapter 12.14 CONTROL OF BACKFLOW AND CROSS-CONNECTIONS
Chapter 12.16 STORM WATER MANAGEMENT
Chapter 12.18 CONSTRUCTION SITE EROSION AND SEDIMENT CONTROL
Chapter 12.24 CONDEMNATION BY GAS OR ELECTRIC COMPANIES