Chapter 20.06 DANGEROUS AND DILAPIDATED STRUCTURES
Section 20.06.090 Extermination procedure before demolition.
All demolition shall be preceded by an inspection of the premises
by the inspecting official to
determine whether or not extermination procedures are necessary. If the premises are found to
be infested, appropriate rat extermination to prevent the spread of rats to adjoining or other areas
shall be instituted before, during and after demolition. (Ord. 84/T-3098).