  • Pierce Street Reconstruction (18th to 24th)

    This project includes the full reconstruction of Pierce Street from 18th Street to 24th Street and includes street paving, sidewalks, ADA compliant sidewalk ramps, landscaping, lighting, storm sewer, sanitary sewer, and water line improvements.

  • South Alice/Linden Way Watermain Repair

    The project is located at South Alice and Linden Way and along South Alice Street to Peters Avenue and includes the construction of new street paving, driveways, upsizing of watermain to current 8” standards, sanitary sewers, storm sewers, and service connections.

  • Cheyenne Blvd Watermain Repair Project

    The project is located at the intersection of Cheyenne Boulevard and Lief Drive. The project includes the construction of watermain to link existing segments to improve the ability to maintain the adjacent watermain segments, ....

  • 2018 ANNUAL RESURFACING PROJECT - PHASE II

    The project is located on West 4th St from Wesley Pkwy to Market St, West 2nd St from George St to West St, and Collins St from West 5th St to West 6th St and includes the construction of curb and gutter, replacement of sidewalk ADA ramps, and construction of asphalt overlays.

  • LEWIS AND CLARK PARK PARKING LOT PROJECT

    The project is located at Lewis and Clark Park, 3400 Line Drive and includes reconstruction of parking lot.

  • 2020 ANNUAL RESURFACING PROJECT PHASE-II

    The project is located at Stone Park Blvd from Hamilton Blvd to Pierce St, 5th St from Pierce St to Jennings St, 11th St from Jackson St to Floyd Blvd, and 14th St from Jackson St to Main St. The project includes the construction of new curb and gutter, sidewalk ADA ramps, and new asphalt overlay.

  • 2020 ANNUAL RESURFACING PROJECT – PHASE I

    The project is located on Douglas St from 3rd St to 6th St, on Douglas St from 8th St to 18th St, on 8th St from Douglas St to Pearl St, and on 14th St from Douglas St to Pierce St and includes the construction of curb and gutter, replacement of sidewalk ADA ramps and construction of asphalt overlay

  • Re-Bid Riverside Aquatic Center Electrical Upgrades

    This project includes electrical upgrades to be installed at Riverside Family Aquatic Center, 1301 Riverside Boulevard.

  • Riverside Park Swimming Pool Recoating Project

    The project is located at 1301 Riverside Boulevard and includes the removal and replacement of Diamond Brite plaster coating at Riverside Park Swimming Pool.

  • Riverside Aquatic Center Electrical Upgrades

    This project includes electrical upgrades to be installed at Riverside Family Aquatic Center, 1301 Riverside Boulevard.

  • Zenith Water Treatment Plant Permanganate Improvements

    The project located at Zenith Water Treatment Plant & includes replacement of the existing potassium permanganate chemical feed system with a new sodium permanganate chemical feed system. Work includes piping, electrical, controls, pumps, mechanical improvements, and a fire suppression system.

  • Martin Building Areaway Improvements Project

    The project is located at the Martin Building in downtown Sioux City at 400 Pierce Street and includes existing areaway abandonment along with related utility relocations and paving improvements.

  • Military Road Reconstruction & Bridge Rehabilitation Project

    This project includes the bridge deck removal and replacement on the Military Road Bridge, new paving, sidewalks, driveways, street lights, DIP water main, sanitary sewer, storm sewer, service connections and cross street connections.

  • Sioux City Art Center Renovation Project

    The project is located at the Sioux City Art Center, 225 Nebraska Street and includes the renovation of the existing interior space.

  • The Garretson Avenue Realignment Project

    The project is located at 158th Street and Garretson Avenue in the east side of Sioux City and includes construction of new paving.

  • Western Hills to Indian Hills Pressure Zone and Tank Demolition Project

    Phase 1 includes the installation of approximately 5,000 LF of 16” water main through an established residential area of the city. Phase 2 and Phase 3 include the installation of approximately 14,000 LF of 16” water main through a mostly undeveloped part of the city. The combined LF is approx 19,000

  • Renewable Fuels - Equipment Procurement No. 2 Project

    The project is located at the Waste Water Treatment Plant, 3100 South Lewis Boulevard and includes a vendor to supply goods and special services, including final equipment procurement for the Renewable Fuels Project.