  • Outer Drive Closures

    Outer Drive between 41st Street and Indian Hills Dr. will be closed beginning September 25 for approximately 4 weeks. Access to surrounding businesses will be maintained. The next phase of the project on Outer Drive between Indian Hills and Floyd Blvd. will include lane closures.

  • Bridgeport Roadway Improvements Phase 4 – Harbor Drive and Murray Street Intersection Improvements

    Harbor Drive and Murray Street Intersection Improvements will begin Monday, September 24, 2018.

  • July Construction Project Updates

    The following is an overview of the City of Sioux City Engineering Division’s projects currently under construction and proposed for this calendar year.

  • 46th Street Bridge Deck Overlay

    This project includes a bridge deck overlay, reconstruction of abutment wings, class A deck repairs, concrete barrier rail retrofit and guardrail installation at the 46th Street Bridge over Floyd River.

  • Rose Hill Park Improvements & Expansion

    The project is located at 1431-1509 Grandview Boulevard in Sioux City, Iowa and includes the construction of a 917 sf splash pad, supplying and installing splash pad equipment, utility improvements for the splash pad and other landscaping and park improvements within Rose Hill Park.

  • 2018 Crack Sealing Project

    This project is located in various locations around the City and includes the filling and sealing of cracks in the paving.

  • Rose Hill Alley Improvements

    The project is located at various locations within the Rose Hill Urban Renewal Area (see map in project plans) and includes alley paving, modular block wall construction, inlets, sidewalks, curb ramps, and associated improvements.

  • 2018 Annual Intake Rehabilitation Project

    Project includes the reconstruction of damaged storm sewer intakes. Project is anticipated to begin in June of 2018 and be completed by September 2018.

  • 2018 Annual Resurfacing

    Project includes the replacement of curb and gutter, replacement of sidewalk ADA Ramps, rehabilitation of storm inlets, and asphalt resurfacing on Lincoln Way from Sergeant Road to Lincoln Way. Work is anticipated to begin in July of 2018 and be completed by October 2018.

  • Hunt Elementary School Site Improvements

    The scope of this project as is relates to street reconstruction, includes removal of all paving, existing storm and sanitary piping structures within the public right-of-way in the project area and the installation of new sanitary and storm piping and structures, and new sanitary services to homes.

  • City Fuel Island Project - Rebid

    The project is located at 1821 18th Street and includes installation of new fuel tanks, fuel pumps, paving replacement, and removal of existing tanks and fuel pumps.

  • Bridgeport West Roadway Imp. (Harbor Dr, Singing Hills BLVD to Aviation BLVD) Phase 3

    The project is located at Harbor Drive, South of Singing Hills BLVD and North of Bridgeport Drive and includes the realignment of Harbor Drive, grading work, and storm water piping.

  • 2018 Discovery Parking Ramp Repair Project

    This project is located at 419 Jones Street in Sioux City, and includes the installation of supplemental structural steel beams and ramp maintenance.

  • Tyson Events Center Wheelchair Ramp Replacement Project

    The project is located at the Tyson Events Center, 401 Gordon Drive and includes the replacement of the wheelchair ramps and repairs to the upper plaza on the southwest corner of the building.