Projects Under Construction

Print
Press Enter to show all options, press Tab go to next option
  • 2019 Annual Curb & Gutter Project

    The project is located on 20th Street from Jackson Street to Ingleside Avenue and includes the removal and replacement of the curb and gutter.

  • Asset Renewal - Dewatering and Odor Control Improvements Phase 1 Project

    The project is located at 3100 South Lewis Boulevard and includes Construction of biosolids dewatering and odor control improvements. See full project description.

  • Rebid Hail Damaged Roofs and Buildings Projects

    The project is located at various buildings within the City Limits, and includes the removal and replacement of translucent insulated fiberglass panel systems, and insulated sheet metal siding.

  • Outer Drive Closures

    Outer Drive between 41st Street and Indian Hills Dr. will be closed beginning September 25 for approximately 4 weeks. Access to surrounding businesses will be maintained. The next phase of the project on Outer Drive between Indian Hills and Floyd Blvd. will include lane closures.

  • Bridgeport Roadway Improvements Phase 4 – Harbor Drive and Murray Street Intersection Improvements

    Harbor Drive and Murray Street Intersection Improvements will begin Monday, September 24, 2018.

  • Parks Department Roofs Replacement Project

    The removal and replacement of the roofs at the following Park locations: the Leif Erikson Park Shelter and Restroom, the Grandview Park Restroom, and the Riverside Park Restroom.

  • South Perimeter Fence Construction Project

    The project is located at the Sioux Gateway Airport and includes South Perimeter Fence construction.

  • Sioux City Skywalk Project

    The project is located at the Skywalk System in downtown Sioux City, Iowa, and includes the removal and replacement of existing furnaces, condensing units, and all associated electrical work. The Alternate work includes the duct work, diffusers, and grid ceiling.

  • Sioux City Public Library Morningside Branch Renovation Project

    The project is located at 4005 Morningside Avenue, Sioux City, Iowa, and includes upgrades to the roofing system, mechanical system, lighting and general construction at the Morningside Branch Library.

  • 2018 Annual Manhole Rehabilitation Project

    The project is located at One Fun Pl, 5th St & Douglas St, 5th St & Iowa St, 8th St & Nebraska St, 2nd St & Jackson St, 5th St & Court St, 1st St & Virginia St, 4th St & Iowa St, 7th St & Court St, & S Helen St & Peters Ave & includes the rehabilitation of damaged sewer & manholes.

  • Gordon Drive Signal Replacement Project

    The project is located at the intersections of Gordon Drive and Stone Avenue and Gordon Drive and Martha Street and includes the removal and replacement of traffic signals at these locations.

  • Digester Cleaning and Inspection Project

    The project is located at the Wastewater Treatment Plant, 3100 South Lewis Boulevard, Sioux City, Iowa and includes cleaning and disposal of contents in an anaerobic digester(s) and providing digester inspection services with repair services, if needed.

  • Convention Center Renovation Project (Rebid)

    The project is located at 801 4th Street, and includes the construction of a new 7,260 square foot addition to the Convention Center, and the renovation of 7,500 square feet of the current convention space into a ballroom.

  • Riverside Park Concrete Pads and Shelters Project

    This project includes two new concrete pads and shelters to be installed at Riverside Park, 1301 Riverside Boulevard.

  • 2018 Sidewalk Program

    The project includes various sidewalk repairs that were ordered by the City Engineer through official notices to property owners to replace/reconstruct defective sidewalk.

  • 2018 Paving Patch Program

    The project is located at Outer Drive, 21st Street and Court Street, and 11th Street and includes paving patch repairs.

  • July Construction Project Updates

    The following is an overview of the City of Sioux City Engineering Division’s projects currently under construction and proposed for this calendar year.

  • Hail Damaged Roofs and Buildings Projects

    The project is located at various buildings within the City Limits, and includes the repair and/or the replacement of translucent insulated fiberglass panel systems, reroofing, siding, and mechanical equipment.

  • Hard Rock Casino and Tyson Events Center Parking Garage Project

    The project is located at 205 Pearl Street, and includes the construction of a new parking garage that will add 534 parking spaces on (4) four levels. The bid package will include precast concrete including stair and elevator towers, Alternate No. 1 LED Boards, and Alternate No. 2 609 SF vestibule

  • 2018 Bridge Repairs

    This project includes multiple bridge repairs at three bridges identified by the annual bridge inspection