  • Gilchrist Learning Center Project

    The project will be located at 220 Pierce Street, and is tied to the Sioux City Art Center, 225 Nebraska Street, Sioux City, Iowa. The project is for construction of a new 10,992 square foot one-story structure used as an art education facility, and will include parking and sod improvements.

  • 2017 Annual Manhole Rehabilitation Project

    The project is located at the intersections of 7th Street and Floyd Boulevard, Cleveland Street and Floyd Boulevard, Arthur Street and Floyd Boulevard, Garfield Street and Floyd Boulevard, West 8th Street and Hamilton Boulevard, and the 100 block to 200 block of Virginia Street, and includes the cast in place concrete rehabilitation of sanitary sewer manholes.

  • 2017 Spalding Farm Park Improvements Project

    The project is located at 4201 Stone Avenue, Spalding Farm Park and includes improvements to the park including, sidewalk/trail (8’ wide) around the existing soccer field, constructing fence between the field and Gordon Drive, and miscellaneous concrete work.

  • August 2017 Construction Update

    Find an overview of the City of Sioux City Engineering Division’s projects currently under construction.

  • 2017 Annual Sidewalk Program

    The project is located at several locations in Sioux City, Iowa and includes the removal and replacement of broken or defective public sidewalk.

  • Riverside Soccer Complex Parking Lot and Bioretention Pond Project

    This project is located at the Riverside Soccer Complex and includes construction of a new parking lot and bioretention pond.

  • Gordon Drive and South Helen Storm Sewer Repair Project

    The project is located at the intersection of Gordon Drive and South Helen Street and includes removing and replacing a failed storm sewer and associated paving.

  • Tyson Events Center Site Repairs Project

    The project is located at the Tyson Events Center in Sioux City, Iowa and includes flatwork repairs to the parking lots surrounding the Tyson Events Center and a new storm inlet for drainage issues at the northeast corner of the facility.

  • City Hall Air Handler Unit Replacement Project

    The project is located at 405 6th Street, and includes removal of old roof top air handler and condensing unit and replace with new units.

  • Street Repairs - 414 11th Street & 2219 Terrace Place Project

    The project is located at 414 11th Street, and 2219 Terrace Place and includes the removal and replacement of full depth street paving, curb and gutter.

  • Zenith Water Facility Structural Preservation Project

    The project is located at the Water Treatment Plant, 1101 TriView Avenue Sioux City, Iowa and includes structural glazed tile masonry tuck-pointing and replacement at the interior, exterior ramp replacement, and window replacement for the existing two-story structure.

  • July 2017 Construction Update

    The following is an overview of the City of Sioux City Engineering Division’s projects currently under construction.

  • 2017 Bridge Repairs Project

    This project includes multiple bridge repairs at various sites around the City; including undermining along the 46th Street Bridge, expansion joint repairs at the Floyd Boulevard Bridge over 3rd Street, repairs for a failed wing wall at the Broken Kettle Road culvert, and the replacement of the Amanda Street timber stringer bridge with three (3) HDPE pipe.

  • Bridgeport Improvements Phase 1-4

    Bridgeport's Improvements consist of installation of a 12 inch sanitary sewer, a 16 inch water main, culverts, grading, concrete pavement, new signal installation, new lane configuration, realignment of Harbor Drive, and construction of a new roadway. This is set to take place in four (4) project phases.

  • 2017 Annual Curb and Gutter Project

    The project is located at 3400 Block of Jennings Street, 31st Street from Jackson to Jones, and West 6th Street and includes removal and replacement of the existing curb and gutter.

  • July 2017 Bridgeport Construction Update

    An update from HR Green regarding Bridgeport Industrial Park construction updates.

  • Tur-Pak Water Main Relocation Project

    The project is located at 6201 Southbridge Drive, Tur-Pak Foods, Inc. and includes 800 feet of 8” – 12” water main in open cut (directional drilled at contractor’s option), water service connections, hydrants, pavement restoration, and seeding. Alternate bid may add 450 feet of 6” water main reloca

  • 30th Street and Pierce Street Intersection Reconstruction Project

    This project is located at the 30th Street and Pierce Street intersection in the north side of Sioux City and includes construction of new paving, water mains, storm sewer and sanitary sewer.

  • 2017 Cone Park Splash Pad and Ice Rink Project

    The project is located adjacent to the Highway 20 bypass at the new Cone Park next to 3808 Stadium Drive, Sioux City, Iowa and includes the construction of a 5,400 SF splash pad and ice rink with refrigeration chillers, recirculation pumps, in-slab piping, and electrical improvements.

  • Bridgeport West Improvements (South Patton Street from Boulevard of Champions to Bridgeport Drive, Harbor Drive, Singing Hills Boulevard, and Southbound I-29 Exit Ramp) Project

    The project is located in the Bridgeport Industrial Park and includes new traffic installation and lane configuration work at the following intersections: Bridgeport Drive and Patton Street, Murray Street and Patton Street, Boulevard of Champions and Patton Street, Harbor Drive and Singing Hills Bou