  • Emergency Floyd Boulevard Sanitary Sewer interceptor Repair Project

    NOTICE OF TAKING BIDS FOR THE CONSTRUCTION OF THE EMERGENCY FLOYD BOULEVARD SANITARY SEWER INTERCEPTOR REPAIR PROJECT (PROJECT NO. 7055B-539-103), IN SIOUX CITY, IOWA.

  • IBP Ice Center Exterior Caulk Joints

    The city of Sioux City is seeking bids for the removal and replacement of the exterior caulk joints at the IBP Ice Center, 3808 Stadium Drive, Sioux City, Iowa.

  • Division Street Paving Project Seneca Way to Pueblo Court

    NOTICE OF TAKING BIDS FOR THE CONSTRUCTION OF THE DIVISION STREET PAVING PROJECT (SENECA WAY TO PUEBLO COURT) (PROJECT NO. 7051-719-121), IN SIOUX CITY, IOWA.

  • April Construction Update

    Find an overview of the City of Sioux City Engineering Division’s projects currently under construction and proposed for this calendar year.

  • 2019 Annual Utility Lining Project

    This project is located on West 20th Street from Myrtle Street to Center Street, Correctionville Road from South Rustin Street to Gordon Drive, and Riverside Boulevard from Military Road to War Eagle Drive & includes the cleaning, televising, & CIPP lining of the sanitary and storm sewers.

  • RIVERSIDE BOULEVARD STORM SEWER CLEANING PROJECT

    The project includes the cleaning of storm sewers on Riverside Boulevard between Military Road and War Eagle Drive and includes the cleaning and televising of storm sewers

  • 2019 PARKING LOT RECONSTRUCTION SIOUX CITY POLICE STATION PROJECT

    The project is located at 601 Douglas Street, Sioux City and includes reconstruction of the Police Station parking lot and adjacent alleyway.

  • 2019 Cable Work for City County Computers

  • Pierce Street Reconstruction (18th to 24th)

    This project includes the full reconstruction of Pierce Street from 18th Street to 24th Street and includes street paving, sidewalks, ADA compliant sidewalk ramps, landscaping, lighting, storm sewer, sanitary sewer, and water line improvements.

  • Christy Road Sidewalk Improvements Project

    The Christy Road Sidewalk Improvements Project includes the construction of a 7 foot sidewalk on the north side of Christy Road beginning at the west side of the driveway located at 5000 ½ Overlook Lane & extending east to the west side of Sunnybrook Drive.

  • South Alice/Linden Way Watermain Repair

    The project is located at South Alice and Linden Way and along South Alice Street to Peters Avenue and includes the construction of new street paving, driveways, upsizing of watermain to current 8” standards, sanitary sewers, storm sewers, and service connections.

  • Cheyenne Blvd Watermain Repair Project

    The project is located at the intersection of Cheyenne Boulevard and Lief Drive. The project includes the construction of watermain to link existing segments to improve the ability to maintain the adjacent watermain segments, ....

  • Annual Hydrant Cleaning and Painting Project

    This project includes the cleaning and painting of hydrants within the City Limits.

  • 2018 ANNUAL RESURFACING PROJECT - PHASE II

    The project is located on West 4th St from Wesley Pkwy to Market St, West 2nd St from George St to West St, and Collins St from West 5th St to West 6th St and includes the construction of curb and gutter, replacement of sidewalk ADA ramps, and construction of asphalt overlays.

  • LEWIS AND CLARK PARK PARKING LOT PROJECT

    The project is located at Lewis and Clark Park, 3400 Line Drive and includes reconstruction of parking lot.

  • 2020 ANNUAL RESURFACING PROJECT PHASE-II

    The project is located at Stone Park Blvd from Hamilton Blvd to Pierce St, 5th St from Pierce St to Jennings St, 11th St from Jackson St to Floyd Blvd, and 14th St from Jackson St to Main St. The project includes the construction of new curb and gutter, sidewalk ADA ramps, and new asphalt overlay.

  • 2020 ANNUAL RESURFACING PROJECT – PHASE I

    The project is located on Douglas St from 3rd St to 6th St, on Douglas St from 8th St to 18th St, on 8th St from Douglas St to Pearl St, and on 14th St from Douglas St to Pierce St and includes the construction of curb and gutter, replacement of sidewalk ADA ramps and construction of asphalt overlay

  • Martin Building Areaway Improvements Project

    The project is located at the Martin Building in downtown Sioux City at 400 Pierce Street and includes existing areaway abandonment along with related utility relocations and paving improvements.

  • Rebid Western Hills to Indian Hills Pressure Zone and Tank Demolition Project

    Phase 1 includes the installation of approximately 5,000 LF of 16” water main through an established residential area of the city. Phase 2 and Phase 3 include the installation of approximately 14,000 LF of 16” water main through a mostly undeveloped part of the city. The combined LF is approx 19,000

  • 2019 Annual Curb & Gutter Project

    The project is located on 20th Street from Jackson Street to Ingleside Avenue and includes the removal and replacement of the curb and gutter.