Upcoming Projects

Print
Press Enter to show all options, press Tab go to next option
  • 2018 Annual Sidewalk Ramp Program

    This project includes the removal and reconstruction of defective or missing sidewalk ramps.

    06/20/2018 10:51 AM

  • Rose Hill Alley Improvements

    The project is located at various locations within the Rose Hill Urban Renewal Area (see map in project plans) and includes alley paving, modular block wall construction, inlets, sidewalks, curb ramps, and associated improvements.

    06/05/2018 9:13 AM

  • 2018 Annual Sidewalk Project

    Safe, pedestrian-friendly neighborhoods are a priority for our community. An important component of this is on-going sidewalk maintenance and repairs.

    05/22/2018 10:33 AM

  • 2018 Annual Manhole Rehabilitation Project

    Project includes the rehabilitation of sanitary and storm sewer manholes. Work is anticipated to begin in June of 2018 and be completed by August 2018

    04/16/2018 11:48 AM

  • Garretson Avenue Realignment Project

    The project is located at 158th Street and Garretson Avenue in the east side of Sioux City and includes construction of new paving.

    04/04/2018 3:18 PM

  • Glenn Avenue Reconstruction (S. Cecelia Street to S. Rustin Street)

    This project will include the full replacement of water, wastewater, and storm sewer infrastructure along with new street and sidewalk paving.

    03/19/2018 3:57 PM

  • Gordon Drive and Martha Street Signal Replacement

    This project includes the removal and replacement of traffic signals at the intersection Gordon Drive and Martha Street.

    03/19/2018 1:55 PM

  • Pierce's Addition Storm Sewer Improvements Project

    This project includes the replacement of street paving, sidewalks, and utilities (water main, sanitary sewer, and storm water infrastructure).

    03/19/2018 1:08 PM

  • South Royce Street and Meyers Avenue Storm Sewer Repairs

    The Project is located at the intersection of S. Royce Street and Meyers Avenue and includes intersection reconstruction, storm sewer reconstruction, water reconstruction, and sewer reconstruction.

    03/19/2018 12:35 PM

  • 2018 Annual Utility Lining Project

    This project includes the point repairs of damaged pipe, cleaning, televising, and CIPP lining of sewers.

    03/19/2018

  • Ingleside Avenue Reconstruction (14th Street- 18th Street) Project

    This project includes a full reconstruction of Ingleside Avenue from 14th Street to 18th Street, and 14th Street from Jackson Street to Ingleside Avenue. This also includes smoothing the curve at the intersection of Ingleside Avenue and 14th Street, new utilities, sidewalk, and driveways.

    11/03/2017 11:55 AM

  • Bluff Road Bridge Project

    Bluff Road Bridge over the Old Floyd Canal will be replaced in the winter of 2019. Various options to improve the existing roadway and bridge system are being considered including a straight bridge alignment, skewed bridge alignment, or a roadway connection without the bridge structure being replace

    09/05/2017 12:38 PM

  • Bridgeport Improvements Phase 1-6

    Bridgeport's Improvements consist of installation of a 12 inch sanitary sewer, a 16 inch water main, culverts, grading, concrete pavement, new signal installation, new lane configuration, realignment of Harbor Drive, and construction of a new roadway. This is set to take place in four (4) project

    07/19/2017 11:45 AM