02/10/2025 4:30 PM
Hauling operations to haul materials to the site and debris away from the demolition of existing water tanks are anticipated to begin on Tuesday, March 23, with the project concluding in September of 2022.
03/08/2021 3:07 PM
11/24/2020 11:30 AM
09/28/2020 4:30 PM
The project is located between Gordon Drive/IA-12 and 1408 South Hennepin Street and includes clearing and grubbing, filling of voids in the berm, and seeding.
03/27/2019 10:48 AM
This Project includes Installing New Fire Hydrants at Dead ends in different locations.
02/15/2019 1:06 PM
This project includes the replacement of street paving, sidewalks, and utilities (water main, sanitary sewer, and storm water infrastructure).
03/19/2018 1:08 PM
The Project is located at the intersection of S. Royce Street and Meyers Avenue and includes intersection reconstruction, storm sewer reconstruction, water reconstruction, and sewer reconstruction.
03/19/2018 12:35 PM
This project includes a full reconstruction of Ingleside Avenue from 14th Street to 18th Street, and 14th Street from Jackson Street to Ingleside Avenue. This also includes smoothing the curve at the intersection of Ingleside Avenue and 14th Street, new utilities, sidewalk, and driveways.
11/03/2017 11:55 AM